16. Bathroom & Kitchen Counters & Cabinets
Adjustments to any bathroom and kitchen counters and cabinets need to be made during the framing stage. After the drywall is done, final measurement for cabinets are made. With the walls primed, the cabinets are installed. Templates are made for surface counter tops, be they marble, granite, or another material. Depending on the age detail, the fabricated counter tops are installed within 3 weeks. All faucets and sinks should be ready at time of templating. The templates are then used to correctly drill holes through the counter tops for connection to the water lines.